UnibenI Large-Scale GRP Water System

PROJECT HEADER

Field

Detail

Client

University of Benin (UnibenI)

Project Type

GRP Water Storage System Installation + Structural Waterproofing

Location

Benin City, Edo State, Nigeria

Sector

Education — Federal University

Scope

GRP tank installation, structural waterproofing, 4,800sqm production facility

Scale

4,800sqm facility area — multiple buildings

Status

Phase 1 completed. Client confirmed Karoch Engineering will return for the full facility.

THE CHALLENGE

The Brief: Campus Water Storage and Waterproofing at Scal

The University of Benin’s 4,800sqm production facility required a complete water storage upgrade alongside structural waterproofing work across multiple buildings. The existing water storage infrastructure was aging and inadequate for the facility’s operational requirements. The waterproofing scope covered a large campus footprint where water ingress had caused ongoing structural deterioration.

The project required a contractor who could manage both disciplines simultaneously — GRP water storage engineering and structural waterproofing — without the coordination overhead of separate specialist sub-contractors. Karoch Engineering was appointed to manage both scopes as a single integrated delivery.

WHAT KAROCH DELIVERED

▸  GRP sectional panel tank installation — multiple tanks across the facility, ground-level and elevated configurations

▸  Structural waterproofing — applied waterproofing treatment across rooftop, basement, and structural surfaces across the 4,800sqm footprint

▸  Pipework connections — inlet, outlet, and distribution connections integrated with the university’s existing water supply infrastructure

▸  Civil preparation works — concrete base preparation and minor civil works for tank installation positions

▸  Project management — single point of contact for both waterproofing and tank scopes, reducing coordination burden on the university

 

THE RESULT

Delivered on Time, to Specification — and Invited Back for the Whole Facility

The project was completed to the University of Benin’s specification and to the satisfaction of the institution’s leadership. The water storage infrastructure is operational. The waterproofing has resolved the ingress issues across the treated areas. The result was not just a completed project — it was a relationship. The Vice Chancellor’s commitment to bring Karoch Engineering back for the entire facility is the most direct expression of client confidence we have received from any client.

Karoch Engineering will return to finish our entire 4,800sqm facility in its entirety.

— Vice Chancellor, University of Benin

 

WHAT THIS PROJECT DEMONSTRATES

Why This Project Matters for Institutional Clients

✓  Federal university delivery experience — understanding of institutional procurement and reporting requirements

✓  Multi-discipline project management — GRP water storage and structural waterproofing under a single contract

✓  Large campus-scale execution — 4,800sqm is not a small project

✓  Client relationship quality — the Vice Chancellor named Karoch Engineering by name for the full facility completion

✓  Edo State presence — project demonstrates reach beyond Lagos

let’s get connected

Have a Question?

Our client-focused approach ensures transparency, accountability, and consistent performance at every stage.